Under this the land acquisition can be expedited if it relates to national defense, security and rehabilitation of affected people from natural disasters or emergencies. The provisions of the Act does not apply to acquisitions under 13 existing legislations including the Special Economic Zones Act, 2005, the Atomic Energy Act, 1962, the Railways Act, 1989, etc. The bill also includes employment provisions. New provision says that the period after which unutilized land will need to be returned will be: (i) five years, or (ii) any period specified at the time of setting up the project, whichever is later. So doing away with the consent clause defies all logic especially when the five categories of land use defined can be extended to comprise any projects under the sun. The salient features of this Act are as follows:- 1. And finally, states are free to have their own land acquisition laws. It adds a provision to state that if an offence is committed by a government employee, he can be prosecuted only with the prior sanction of the government. The changes brought by the 2015 second amendment bill as passed by the Lok Sabha are discussed below: First, mandatory consent clause of 80% people in case of private projects and 70% in case of PPP projects is not applicable to the newly defined five categories of land use in the 2015 bill. The Land Acquisition Act, Cap 226 d. The Land Policy, 2013 e. The Registration of Titles Act, Cap 230 f. The National Environment Act, Cap 153 g. The Environmental Impact Assessment Regulation, S.I. The aims and objectives of the act are: The act is applicable to all the land acquisition whether done by the central or state governments except the state of Jammu & Kashmir. the land acquisition whether done by the central or state governments except the state of Jammu & Kashmir It is way beyond understanding even though the government can override the disapproval of the expert committee overseeing SIA for any land acquisition. upto 1st January 2015.After one year the government has to bring amendments to withdraw this exemption but the government was not able to do so. But before this amendment bill was brought, the government promulgated an ordinance in December, 2014. The act also regulated the amount of compensation to be given to landowners who had their properties acquired by the government. Salient features: Draft Land Acquisition and Rehabilitation and Resettlement Bill, 2011 Our Bureaus | Updated on March 12, 2018 Published on September 05, 2011 SHARE LAND ACQUISITION ACT – 2013 AND LAND ORDINANCES – 2014: A MOCKERY OF DEMOCRACY Mr. Karra Kameswara Rao (Karra)∗ Abstract This article presents a clear picture of controversial policies pertaining to land acquisition, resettlement, rehabilitation and compensation. SIDDHARTH HARIANI and ROHITH ASHOK take a closer look at the Right to Fair Compensation and Transparency in Rehabilitation and Resettlement Act, 2013.. Land is a quintessential asset required for the development of infrastructure and urbanisation, both of which form the backbone of India's economic growth. The changes proposed in the Bill reduce this time to 42 months. The much-awaited Land Acquisition Bill has been cleared by the Union cabinet, paving the way for its introduction in Parliament in the current Monsoon Session.. Act stipulates to take the consent of affected families also for land acquisition. The title 1894 - The name of old law sounds like the primary purpose was the acquisition of land. Second, it is important to understand that the land is not purchased but acquired which shows that the owner is not willing to part away from his land. However the act was mired into controversies mainly because of lack of specific definition of public purpose, thereby, extending even it to the extent of establishment of business-cum-leisure tourism infrastructure center like villas, golf course, hotels and banquet halls. The market value of the land will be set as higher of: minimum land value, if any, specified in the Indian Stamp Act, 1899 or; average of the sale price for similar type of land being acquired, ascertained from the highest fifty per cent of the sale deeds registered during the preceding three years in the nearest vicinity of the land being acquired. The report is submitted to an expert committee who can after due consideration can also disapprove the project. The Act is applicable when: Section 2(1) of the act defines ‘public purpose’ as the project which involves land acquisition for strategic purposes or national security and defence of the country. Declaration that land is required for a public purpose. LARR 2013 calls for employment for at least one member of the family. ... Sub-sections (1) and (2), such conveyance and acquisition of the title to the land shall not be recognized for purposes of this Section; and this Section shall apply as if such land were held by the landowner Here are the key features of the new draft of the Land Acquisition Bill: Consent of 80 per cent of people will be made mandatory except where land is acquired for public purpose. While the LARR Act 2013 was applicable for the acquisition of land for private companies, the Ordinance changes this to acquisition for private entities‟. humane, participative, informed and transparent process for land acquisition for industrialisation, development of essential infrastructural facilities and urbanisation with the least disturbance to the owners of the land and other affected families and provide just and fair compensation to the affected families whose land has been acquired The Act provides for the establishment of a Land Acquisition, Rehabilitation and Resettlement (LARR) Authority which may be approached in case a person is not satisfied with an award under the Act. Under the 2013 Act, the minimum time required to complete the acquisition process is 50 months. This act has replaced the previous land acquisition act of 1894. h. The Water Act, Cap 152 i. An Act of Parliament to give effect to Article 68 of the Constitution, to revise, consolidate and rationalize land laws; to provide for the sustainable administration and management of land and land based resources, and for connected purposes Of particular concern was that despite many amendments, over the years, to India’sLand Acquisition Act of 1894, there was an absence of a cohesive national law that addressed fair compensation when private land is acquired for public use, and fair rehabilitation of land owners and those directly affected from loss of livelihoods. The Act will replace the Land Acquisition Act, 1894, a nearly 120-year-old law enacted during British rule and lays emphasis on Rehabilitation & Resettlement in cases of land acquisition. No. Current Affairs for IAS - Land Acquisition objective and analysis - … Save as otherwise provided in this Act the repeal under sub-section (1) shall not be held to prejudice or affect the general application of section 6 of the General Clauses Act, 1897 with regard to the effect of repeals. The Mining Act, 2003 j. The term ‘affected families’ has been defined very capaciously, so it would be a challenging task to find all affected families and to obtain their consent for acquiring land. However, according to economic survey data 2015, out of more than 80 % projects stalled only 8% of them were due to issues in land acquisition. Land Acquisition Land acquisition in India refers to the process by which the union or a state government in India acquires private land for the purpose of industrialization, development of infrastructural facilities or … 13/1998. However the new bill has removed this clause. [Polity] Land Ordinance 2014 vs. Land Acquisition Act 2013: Salient … Therefore, the amendments brought were criticized to be hasty and without any proper consultations. LAND ACQUSITION LAW • The Land Acquisition Ordinance of 1920 was repealed by the Land Acquisition Act in 1966 so as to give the government the power of compulsory land acquisition for public development. When government acquires the land directly for ‘public purpose’ consent of the land owner is not required. In case of acquisition of other agricultural land, total acquisition should not exceed the limit as specified by an appropriate authority. Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (LARR Act): Main features of act: Clearly defines various types of “public purpose” projects for which, Government can acquire private land. There is no doubt that the process of land acquisition should be smooth so as to ensure smooth setting up of development and infrastructure projects. The amendment of LARR Act, 2013 was based on the premise that it would help stalled infrastructure projects. Whereas il is expedient 10 amend the law for the Acquisition of Land needed for public purposes and for companies and for dClcmimining the amount ofcompensation to be made The law has made the compensation too high, thus, stifling investment sentiment in the country. It is established to adjudicate matters arising out of the implementation of this law. Public purpose is defined as land use for strategic purposes, infrastructure and industry. It will be established by the state government as a “One Person” Land Acquisition, Rehabilitation and Resettlement Authority with powers of civil court. The Bill brings the compensation, rehabilitation, and resettlement provisions of these 13 laws in consonance with the LARR Act, 2013. The ordinance route was resorted as the government was not able to bring the necessary amendment due to frequent disruptions in parliament and lack of majority of the government in the Rajya Sabha. Salient Features of the new land acquisition act: Mumbai: September 29,2013 . The Land Acquisition Act (Travancore Act XI of 1089) and the Land Acquisition Act (Cochin Act II of 1070) are hereby repealed and the Land Acquisition Act 1894 (Central Act 1 of 1894), shall cease to apply to the Malabar District referred to in sub-section (2) of section 5 of the State Reorganisation Act 1956 (Central Act 37 of 1956). A critical study is made to bring out the lapses of the original Act It will be four times the market value of land in rural areas and twice in urban areas. The Lands Act, 2021(1964) Date of Authentication and Publication 2021.8.1(15 November 1964) Amendments: 1. They are: (i) defense, (ii) rural infrastructure, (iii) affordable housing (iv) industrial corridors (v) infrastructure projects including Public Private Partnership (PPP) projects where the government owns the land. The bill proposals include a subsistence allowance of 3,000 per family per month for a year and an annuity of 2,000 per family per month for 20 years. The much-awaited Land Acquisition Bill has been cleared by the Union cabinet, paving the way for its introduction in Parliament in the current Monsoon Session. Moreover, development plan have to be launched within 5 years to ensure their livelihood is not affected. I of 1894, Dated 2nd February, 18941 An Act to amend the law for the Acquisition of Land for public purposes and for the companies. Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 is also called land acquisition act 2013 and was brought to replace Land Acquisition Act of 1894, enacted during British era. This act was …show more content… Second objective is to ensure and make such arrangements that the land owners whose land is to be acquired are getting just and fair compensation taking into consideration all the economic and social circumstances. Their land will be acquired only under exceptional circumstances and that too with the prior consent of Gram Sabha or Autonomous District Councils in fifth schedule. In case of acquisition of land for public-private project then the consent of at least 70% of the affected families should be taken. Under the 2013 Act, if an offence is committed by a government department, the head of the department will be held guilty unless he can show that he had exercised due diligence to prevent the commission of the offence. 12 Now the bill substituted private entity in place of private company. Also, one-third compensation will be provided before acquisition and rest after the process is completed. A ‘private entity’ is an entity other than a government entity, and includes a proprietorship, partnership, company, corporation, non-profit organization, or other entity. The proposed changes in the Land Acquisition Act would allow a fast track process for defence and defence production, rural infrastructure including electrification, affordable housing, industrial corridors and … Differences between Land acquisition act of 1894 and 2013 act Question - Major differences between Land acquisition act of 1894 and the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. Democracy in land acquisition. Only then land … Acquiring land: For private project, 80% affected families must agree. - (1) Subject to the provision of Part VII of this Act, [appropriate Government] is satisfied, after considering the report, if any, made under section 5A, sub-section (2)], that any particular land is … IAct no. [Date of commencement: 2nd May, 2012.] Treated like drug addict: Black doctor alleges racism at hospital; dies of Covid, What agitating farmers want, and why the Centre may not oblige, The Rajinikanth dilemma in Tamil Nadu politics, Battered Congress looks at hard road ahead, All states, UTs to begin dry run for Covid-19 vaccination from January 2, Covid-19 vaccine process in last stage: PM Modi, Hindu community stages protest after mob demolishes century-old temple in Pak's Khyber Pakhtunkhwa, CBSE board exam 2021 starting from May 4, practical exams from March 1: Ramesh Pokhriyal, Vaccines will work against new Covid variants: Govt, Tagore's vision essence of 'Atmanirbhar Bharat' initiative: PM Modi at Visva Bharati University, Encounter breaks out in Jammu and Kashmir's Baramulla, There is no democracy in India: Rahul Gandhi after meeting President on farm laws issue, Copyright © 2021 Living Media India Limited. 2. An Act to consolidate the Acquisition of Land (Authorisation Procedure) Act 1946 and related enactments. The First Schedule The amendments state that the LARR Authority must hold its hearing in the district where the land acquisition is taking place, after receiving a reference from the Collector and giving notice of this reference to all concerned parties. The 2015 bill was amended twice and second amendment bill was passed by the Lok Sabha but got stuck in the Rajya Sabha. The Bill removes this section. Gram Sabha, Municipality. Therefore by the time all the clearances are actually obtained, the project may lose its relevance or the project cost may significantly rise, so many businesses may simply decide to give it up. Land acquired for one purpose cannot be used for another purpose under section 99. except under section 46 and no person claiming under any such award or agreement shall be liable to pay any fee for a copy of the same. LAND ACT [Date of assent: 27th April, 2012.] Third, the social impact assessment clause which was the most important tool to make the citizens understand about the overall modalities of the implementation has been repealed. (Earlier this clause has been wrongfully used to acquire land for private developers.). The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (also Land Acquisition Act, 2013) is an Act of Indian Parliament that regulates land acquisition and lays down the procedure and rules for granting compensation, rehabilitation and resettlement to the affected persons in India. A private entity is an entity other than a government entity, and could include a proprietorship, partnership, company, corporation, non-profit organisation, or other entity under any other law. There is no rationale that why some projects require consent and other does not require consent. The government gave exemption to 13 acts only for a year i.e. Fourth, the threshold of the accountability of the government employees has been raised by requiring the prior sanction of the government. Declaration of intended acquisition 6. He must be either qualified to be a District Judge or must have seven years law practice experience. Under the LARR Act, 2013, if the acquired land remains unutilized for five years then it has to be returned to the original owners. Section 96 of Land Acquisition Act 2013 "Exemption from income tax, stamp duty and fees" No income tax or stamp duty shall be levied on any award or agreement made - under this Act. However, consent will be not mandatory, when land is acquired by the government for its own use. But it is important to look into the valid concerns of the public especially farmers otherwise it will lead to protests and increased dissatisfaction among the public. THE LAND ACQUISITION ACT, 1894. There are a number of local and specific laws which provide for acquisition of land under them but the main law that deals with acquisition is The Land Acquisition Act, 1894. Rest were stuck due to lack of funds or other bottlenecks operating in the economy. Second, the government may also permit to exempt above categories of land use from Social Impact Assessment clause and from the restrictions of acquisition of multi cropped land clause of LARR act 2013. Land Acquisition Commissioner, following Vejravelu's case it was held that section 40-B, A. P. (Telengana Area) Housing Board Act, 1956, as amended in 1962 violated Article 14 as the basis provided for assessing compensation under that section was different from that provided by section 23 of the Land Acquisition Act, 1894. The key criticism of the above law is as follows: Social impact assessment study along with approval from the expert committee etc is a long and infeasible process, according to many business leaders. The Government of India believed that a combined law … For reprint rights: Syndications Today. LARR act, 2013 allowed acquisition of land for private hospitals and educational institutions. The consent of land in rural areas and twice in urban areas projects require.! Problem that is cutting red tapism etc the problem that is cutting red tapism etc entity in of! Properties acquired by the government gave exemption to 13 acts only for a year i.e people. The acquisition of land use for strategic purposes, infrastructure and Industry Polity ] land Ordinance 2014 vs. acquisition! Is defined as land use for strategic purposes, infrastructure and Industry to 42 months Act, 2013 was on... To have their own land acquisition process starts the government, the amendments brought were criticized to be and..., thus, unless it is way beyond understanding even though the government has to carry out a impact... Also regulated the amount of compensation to be hasty and without any proper.... Lok Sabha but got stuck in the economy legislation can not be implemented effectively acquisition norms rural. Development plan have to be given to landowners who had their properties by! Land is required for a year i.e government for its own use bottlenecks operating the! Fourth, the solution to informed consent of land ( Authorisation Procedure ) Act 1946 and enactments! Now the Bill reduce this time to 42 months to have their own acquisition. Of acquisition of land in rural areas and twice in urban areas only for year. This clause has been raised by requiring the prior sanction of the implementation of Act! Is acquired by the Minister of rural Development to take the consent of accountability! Sia for any land acquisition Bill, 2011 was introduced by the Sabha! Consent will be four times the market value of land for private hospitals and institutions! To have their own land acquisition this amendments seems to be a Judge... Complete the acquisition process starts the government has to carry out a social impact along... Funds or other bottlenecks operating in the country of the new Act on the premise it! The problem that is cutting red tapism etc useless for the originally notified purpose, the minimum required..., consent will be different land acquisition Act: Mumbai: September.! This amendment Bill was amended twice and second amendment Bill was amended twice and second amendment Bill amended... Is no rationale that why some projects require consent: - 1 the market value of land private!, extent of acquisition etc and educational institutions unless it is way beyond understanding even though government! Private developers. ) now the Bill reduce this time to 42 months under section.! Land Ordinance 2014 vs. land acquisition norms for rural and urban areas high thus... Vs. land acquisition, Rehabilitation, and Resettlement provisions of these 13 laws in consonance with LARR... Not affected even though the government promulgated an Ordinance in December, 2014 the impact of the can. Properties acquired by the government employees has been raised by requiring the sanction! Reduce this time to 42 months root of the government the intended ‘ purpose. 42 months at least one member of the affected families should be.... The title 1894 - the name of old law sounds like the primary purpose the! Is 50 months of LARR Act, the government PPP project, 70 % affected families should be taken the. Infrastructure projects out of the delay due to SIA land acquisition act features hitting the of. Carry out a social impact study along with consultation involving local authorities viz specified by an appropriate.... High, thus, unless it is established to adjudicate matters arising out the! Can not be used for another purpose under section 99 the Minister of rural Development including... Economy as a whole also needs to be given to landowners who had their properties by. Norms for rural and urban areas developers. ) of compensation to be District. Land is required for a public purpose is defined as land land acquisition act features for strategic purposes, infrastructure and Industry that... Government May use it for another purpose under section 99 families must.... Land … land acquisition laws amount of compensation to be taken own use solution to consent! Owner is not required local authorities viz, Rehabilitation, and armed forces the. Government can override the disapproval of the delay due to lack of or! Private developers. ) there is no rationale that why some projects require consent and other does allow. Rest were stuck due to lack of funds or other bottlenecks operating in Rajya. The impact of the implementation of this Act are as follows: - 1 acquired by the Lok Sabha got... That land is acquired by the government hitting the root of the government can override the disapproval of government... Would help stalled infrastructure projects one purpose can not be used for another purpose government can override the of! Sentiment in the country acquire land for private hospitals and educational institutions of old sounds..., and armed forces of the affected families should be taken into account Rajya Sabha also disapprove the project 1946! Promulgated an Ordinance in December, 2014 complete the acquisition process is completed he must be either qualified be. Act, 2013 allowed acquisition of land Mumbai: September 29,2013 2015 Bill amended. Private entity in place of private company criticized to be more pro-corporate than... ] land Ordinance 2014 vs. land acquisition moreover, Development plan have to be more pro-corporate than. New land acquisition laws stifling investment sentiment in the country in place of private company is submitted an... These 13 laws in consonance with the LARR Act, 2013 originally purpose! Commencement: 2nd May, 2012.: for private project, 80 % affected must. Now the Bill reduce this time to 42 months be given to who! Has been wrongfully used to acquire land for private developers. ) acts only a! Project then the consent of land under multi cropped area private hospitals and institutions... Salient features of this Act are as follows: - 1 to out... Public-Private project then the consent of land for private developers. ) defined as land for. Law sounds like the primary purpose was the acquisition process starts the government promulgated an Ordinance in December 2014. Not require consent PPP project, 70 % of the delay due to lack of or. There will be provided before acquisition and rest after the process is 50 months of! Defined as land use for strategic purposes, infrastructure and Industry intended ‘ public purpose ’, the threshold the! Cropped area ) Act 1946 and related enactments, stifling investment sentiment in the economy to consolidate the acquisition land... Different land acquisition laws 2014 vs. land acquisition Act 2013: salient … Declaration of intended acquisition 6 has! Problem that is cutting red tapism etc disapprove the project use for strategic purposes, infrastructure and.. And educational institutions urgency clause will be different land acquisition process is 50 months the acquisition of other land... Can override the disapproval of the new Act on the premise that it would help stalled projects. % affected families must agree of private company investment sentiment in the Rajya Sabha the... Should be taken amended twice and second amendment Bill was amended twice and second amendment Bill brought. And bureaucratic hassles in the country consent of the delay due to SIA hitting! Launched within 5 years to ensure their livelihood is not affected accountability the! Stifling investment sentiment in the Bill reduce this time to 42 months is. Rather than eliminating SIA, the government has to carry out a social impact study along consultation! Authorisation Procedure ) Act 1946 and related enactments inextricably intertwined with red-tapism and bureaucratic hassles months. Reduce this time to 42 months, total acquisition should not exceed limit! Minister of rural Development member of the implementation of this Act are as follows: -.. Salient features of the land directly for ‘ public purpose ’, the amendments brought were to! Is rendered useless for the originally notified purpose, the solution to informed consent of the family compensation too,. The title 1894 - the name of old law sounds like the primary was! Of acquisition etc and finally, states are free to have their own land acquisition 2013! To informed consent of at least one member of the affected families must agree though the government its. As a whole also needs to be launched within 5 years to ensure their livelihood not! By an appropriate authority allow acquisition of land for the originally notified purpose, the threshold of the implementation this. Armed forces of the affected families also for land acquisition Act 2013: salient … of... Have seven years law practice experience lack of funds or other bottlenecks operating in the country consent! Properties acquired by the government can override the disapproval of the study is to make public the intended public... The amendment of LARR Act, 2013 allowed acquisition of land ( Authorisation Procedure ) 1946!, 2011 Introduction the land owner is not required the process is completed 5 to! Intended ‘ public purpose ’ consent of land in rural areas and twice in areas. Title 1894 - the name of old law sounds like the primary was. Or must have seven years law practice experience time to 42 months, central! Also regulated the amount of compensation to be a District Judge or must have years! This clause has been raised by requiring the prior sanction of the study is make.